English specification desk How guides are written

Home / Pumps / How to specify an Acid Pump

Pumps

How to specify an Acid Pump

What to put on an RFQ for Acid Pump: the ratings, documents, and constraints that change the quote.

25 Oct 2026 · 3 min read · Tradinor Desk

Specification points for Acid PumpTRADINOR · FIGUREWhat to lock for Acid PumpMaterialsPowerInstallationSeal
Put these on the RFQ for Acid Pump before you compare prices.

A buyer searching for Acid Pump is usually trying to stop a bad substitute. A pump is specified at the duty point: flow, head, the liquid, and the power. The notes below are selection criteria for an Acid Pump. They are not a catalog promise. Confirm every rating on the current datasheet, drawing, or test report for the revision you will receive.

What has to be true of Acid Pump

A pump is specified at the duty point: flow, head, the liquid, and the power. For an Acid Pump, start from the duty, then the interface to the rest of the machine or the room, then the document that proves the claim. A lower price that leaves one of those blank is a different product.

Acid Pump is easy to confuse with Progressive Cavity Pump. If the quote could be read as either, add the line that separates them: the rating, the fitment, or the standard named below. Link the drawing number to that line so receiving inspection can reject the wrong one.

Numbers that change the quote

Line What to write for Acid Pump
Materials Casing, impeller, and seal matched to that liquid.
Power Supply voltage and the power at the duty point.
Installation Flooded, suction lift, or submersible depth.
Seal Mechanical seal or packing, and whether the liquid can leak.
Duty point Flow and head together, not the maximum of each.
Liquid What it is, the temperature, viscosity, and solids.

How to compare two offers

Lay both quotes for Acid Pump on one sheet and line up materials, power, and installation. If a cell is empty, the offer is not finished. Ask for the missing line in writing. When those match, the honest difference is lead time, the test evidence, and who carries the warranty. Do not average a fully specified Acid Pump with a cheaper line that omitted materials.

Documents worth having before the deposit

Ask for the curve with the duty point marked. The file should name Acid Pump and the revision, not only the supplier’s homepage. A factory quality certificate such as ISO 9001 can sit beside that file. It does not replace it.

Failures that show up after delivery

  • Sizing on maximum flow at zero head.
  • Using a water pump on a solvent or a slurry.
  • Ignoring NPSH when the suction is difficult.

On an Acid Pump, the expensive version of the first mistake is discovering it after the goods are in the crate. Put the rejection condition in the purchase order while the supplier can still restate the offer.

A worked RFQ line

Use this shape, then replace the brackets with your duty: “Acid Pump — Write flow, head, liquid, materials, and power.” That sentence is a template, not a rating of any brand. If a supplier’s datasheet uses different units, convert them onto this sheet so the next offer can be compared.

Where words like waterproof / IP65 belong

Searches often add a constraint to Acid Pump: waterproof / IP65, or explosion-proof / ATEX. Keep those on this page. IP65 in IEC 60529 means dust-tight and protected against water jets. Write that code if hoses are the real exposure. The word waterproof alone does not name a test. ATEX or IECEx is a certificate for a zone, a gas or dust group, and a temperature class. An IP rating does not grant it. Skip the mark if the site is not hazardous. If you need a third constraint, add it as another line on the same drawing. A second URL that only swaps the adjective does not give a buyer a second fact.

Related in this section: how to specify Progressive Cavity Pump.

Questions buyers actually ask

What should an RFQ for Acid Pump include?

Write flow, head, liquid, materials, and power.

Is a cheaper Acid Pump the same part?

Only if materials, power, and the documents match. A missing line is a different offer.

Do waterproof, OEM, or IP words need their own page?

No. For Acid Pump they are extra lines on this specification. Ask for the test or the drawing that gives the word a value.