English specification desk How guides are written

Home / Automation / How to specify an Automation

Automation

How to specify an Automation

What to put on an RFQ for Automation: the ratings, documents, and constraints that change the quote.

25 Oct 2026 · 3 min read · Tradinor Desk

Specification points for AutomationTRADINOR · FIGUREWhat to lock for AutomationEnvironmentFunctionSignalsNetwork
Put these on the RFQ for Automation before you compare prices.

A buyer searching for Automation is usually trying to stop a bad substitute. An automation component is specified by the signal, the network, the count of points, and who maintains the program. The notes below are selection criteria for an Automation. They are not a catalog promise. Confirm every rating on the current datasheet, drawing, or test report for the revision you will receive.

What has to be true of Automation

An automation component is specified by the signal, the network, the count of points, and who maintains the program. For an Automation, start from the duty, then the interface to the rest of the machine or the room, then the document that proves the claim. A lower price that leaves one of those blank is a different product.

Automation is easy to confuse with RFID Reader Automation. If the quote could be read as either, add the line that separates them: the rating, the fitment, or the standard named below. Link the drawing number to that line so receiving inspection can reject the wrong one.

Numbers that change the quote

Line What to write for Automation
Environment Panel ambient and the IP code if it is outside the panel.
Function Controller, I/O, drive, or HMI. They are not interchangeable.
Signals Voltage, PNP or NPN, or analog range.
Network The protocol the plant already speaks.
Capacity Points, axes, or scan needs if the process cares.
Software The license and who owns the source.

How to compare two offers

Lay both quotes for Automation on one sheet and line up environment, function, and signals. If a cell is empty, the offer is not finished. Ask for the missing line in writing. When those match, the honest difference is lead time, the test evidence, and who carries the warranty. Do not average a fully specified Automation with a cheaper line that omitted environment.

Documents worth having before the deposit

Ask for the protocol and the I/O type in the same line. The file should name Automation and the revision, not only the supplier’s homepage. A factory quality certificate such as ISO 9001 can sit beside that file. It does not replace it.

Failures that show up after delivery

  • Buying an HMI and expecting it to be the safety controller.
  • Mixing PNP sensors with NPN cards.
  • Leaving the software license out.

On an Automation, the expensive version of the first mistake is discovering it after the goods are in the crate. Put the rejection condition in the purchase order while the supplier can still restate the offer.

A worked RFQ line

Use this shape, then replace the brackets with your duty: “Automation — State function, signal type, network, capacity, and software.” That sentence is a template, not a rating of any brand. If a supplier’s datasheet uses different units, convert them onto this sheet so the next offer can be compared.

Where words like IP67 belong

Searches often add a constraint to Automation: IP67, or OEM / custom. Keep those on this page. IP67 is dust-tight plus a defined temporary immersion. It is not a rating for living underwater, and it says nothing about sunlight or salt. OEM or custom means a drawing, a revision, and a statement of who owns the tool. Without those, you are buying the catalog part. If you need a third constraint, add it as another line on the same drawing. A second URL that only swaps the adjective does not give a buyer a second fact.

Related in this section: how to specify RFID Reader Automation.

Questions buyers actually ask

What should an RFQ for Automation include?

State function, signal type, network, capacity, and software.

Is a cheaper Automation the same part?

Only if environment, function, and the documents match. A missing line is a different offer.

Do waterproof, OEM, or IP words need their own page?

No. For Automation they are extra lines on this specification. Ask for the test or the drawing that gives the word a value.