English specification desk How guides are written

Home / Medical Equipment / How to specify an AED

Medical Equipment

How to specify an AED

What to put on an RFQ for AED: the ratings, documents, and constraints that change the quote.

25 Oct 2026 · 3 min read · Tradinor Desk

Specification points for AEDTRADINOR · FIGUREWhat to lock for AEDServiceIntended useEnvironmentPerformance
Put these on the RFQ for AED before you compare prices.

A buyer searching for AED is usually trying to stop a bad substitute. This is a purchasing checklist for a device: intended use, environment, and the regulatory file. It is not a diagnosis, a dose, or an instruction to treat anyone. The notes below are selection criteria for an AED. They are not a catalog promise. Confirm every rating on the current datasheet, drawing, or test report for the revision you will receive.

What has to be true of AED

This is a purchasing checklist for a device: intended use, environment, and the regulatory file. It is not a diagnosis, a dose, or an instruction to treat anyone. For an AED, start from the duty, then the interface to the rest of the machine or the room, then the document that proves the claim. A lower price that leaves one of those blank is a different product.

AED is easy to confuse with UV Sterilizer Medical. If the quote could be read as either, add the line that separates them: the rating, the fitment, or the standard named below. Link the drawing number to that line so receiving inspection can reject the wrong one.

Numbers that change the quote

Line What to write for AED
Service Consumables, calibration, and who is allowed to service it.
Intended use The use the manufacturer states, copied, not extended.
Environment Hospital, clinic, or home, as the file allows.
Performance The measurement range and accuracy the manufacturer publishes.
Alarms and power What happens when mains fails, if the device is life-supporting. Confirm in the manual.
Regulatory The device class and the registration in the country of sale.

How to compare two offers

Lay both quotes for AED on one sheet and line up service, intended use, and environment. If a cell is empty, the offer is not finished. Ask for the missing line in writing. When those match, the honest difference is lead time, the test evidence, and who carries the warranty. Do not average a fully specified AED with a cheaper line that omitted service.

Documents worth having before the deposit

Ask for the instructions for use and the registration. Do not add clinical claims. The file should name AED and the revision, not only the supplier’s homepage. A factory quality certificate such as ISO 9001 can sit beside that file. It does not replace it.

Failures that show up after delivery

  • Ignoring the service and calibration contract.
  • Importing a class of device the destination has not registered.
  • Buying a wellness gadget and describing it as a diagnostic device.

On an AED, the expensive version of the first mistake is discovering it after the goods are in the crate. Put the rejection condition in the purchase order while the supplier can still restate the offer.

A worked RFQ line

Use this shape, then replace the brackets with your duty: “AED — State intended use, environment, published accuracy, regulatory class, and service.” That sentence is a template, not a rating of any brand. If a supplier’s datasheet uses different units, convert them onto this sheet so the next offer can be compared.

Where words like RoHS / CE belong

Searches often add a constraint to AED: RoHS / CE, or stainless / corrosion. Keep those on this page. RoHS is a material limit. CE is a declaration that lists the rules relied on. Ask for the document that names this part number and revision. Name the alloy or the coating and the chemical it must survive. Stainless is a family, not a guarantee. If you need a third constraint, add it as another line on the same drawing. A second URL that only swaps the adjective does not give a buyer a second fact.

Related in this section: how to specify UV Sterilizer Medical.

Questions buyers actually ask

What should an RFQ for AED include?

State intended use, environment, published accuracy, regulatory class, and service.

Is a cheaper AED the same part?

Only if service, intended use, and the documents match. A missing line is a different offer.

Do waterproof, OEM, or IP words need their own page?

No. For AED they are extra lines on this specification. Ask for the test or the drawing that gives the word a value.